Project ยท New build
New house build
The photos follow one house from the old one coming down, through the dig, footings, foundation and frame, to stone on the walls.

- What
- A house, built new
- Time
- About six months, demolition to finish
- GDE's role
- GDE did the full job
Groundwork
The old house is pulled down, then the lot is dug out where the new house will stand.


Foundation
Timber forms shape the footings in the excavation, and boards and stakes hold the edge of a pour. A stair form is shown with steel reinforcing bars in it.



Frame
A timber floor frame sits on the concrete foundation wall, then floor joists and the first sheets of subfloor go on top.


Stone
The upper storeys are clad in grey stone, with arched windows and a pitched porch roof.

Start with a site visit.
Young comes to your home, looks at the job and listens. The visit is free.
Book a site visit with the owner